New complex under construction in Mersin, Tarsus
Construction on a plot of land of 41,080 m2
Will consist of 7 blocks
Each block with 15 floors
On an area of 30,000 m2, 20,000 m2 will be allocated for a social area and 10,000 m2 for a retail area
Paris (A Blok) and Tokyo (B Blok) will be completed on 30.06.2025
Other blocks and completion of construction on 10.06.2026
Start of construction: 10.10.2022
1 + 1 and 2 + 1 apartments
Areas of 1 + 1 - 70 m2 gross, 49 m2 net
Areas of 2 + 1 -
100 m2 gross, 80 m2 net
105 m2 gross, 85 m2 net
Price 1 + 1 from 00 euros
Price 2+1 from 00 euros.
Down payment 50%, 12-month installment plan.
General characteristics:
- Natural Gas System
- Heat-resistant pumice is used
- Smart elevator system
- Internal fire alarm
- Full generator
Apartment features:
- Suspended ceiling
- Kitchen cabinets
- Wardrobe in the hallway
- Wardrobe in the bathroom
- Kitchen Countertop
- Steel entrance door
- Double-glazed windows for PVC windows
- Imported silicone-based paint
- 1st class plumbing
- 1st class shower cabin
- 10 mm thick laminate
- Glass balcony railings
Infrastructure:
- Outdoor swimming pool
- Open and closed parking
- Open Playground
- Gazebos
- Basketball court
- Indoor sports hall
- Decorative pool
- Cafes and restaurants
- Gazebos
- Open and closed retail outlets
Distances:
- to the beach - 10 km (10 minutes)
- to Cukurova Airport – 7 km (10 minutes)
- to the shopping center "TARSU" - 20 m
- In addition, a public beach will be opened



